Dear All,
Recently BI and ECC production systems undergone Linux patching at the same time and after Linux patching delta load from 2LIS_11_VASCL failed since previous delta request still running (I was quite not sure which chain has triggered the previous load), when I check the load form process monitor load current running load was stuck with the below mentioned message. Surprisingly I never found job for this load neither in BI nor in ECC. So I had to cancel this load as this was stalling important further processes.
I have changed the technical status to red and while changing technical status itself system warned me that "Delta repeat" option would never be available further if change the status to "RED"(I hope this is not good practice). Still I went ahead and changed status as I mentioned it staled important processes.
Later I ran the info package as expected "Repeat delta" didn't come, load was delta update and it bought around 500+ records. I suspect definitely there is data loss. I need to perform full repair and prior to that I need to confirm client that how may records are missing exactly and it's impact, as full repair takes lot's of time for 2LIS_11_VASCL.
I would appreciate if you help me with the below points.
1. Is there any other option to cancel the job other than changing technical status to red in this type of situation ?
2. Now I would like to compare how many records are missing, against which table I need to compare and what selections I need to make?
Note: Using BI 7.0 System
Thanks a lot in advance for you guidance.
Regards,
Prakash K