Hello, I have a question about 3.5 data flow. I have an extractor linked to DSO. The infopackage settings are set for "PSA AND THEN INTO DATA TARGETS". some bad records came in this morning. I was able to fix them in PSA. so now should i delete the request from the DSO and then do "Update using scheduler"? or how should i proceed? thanks.
↧