Hi Experts,
I am planning to create a flow in which one source DSO will be loading data to 2 different cubes simultaneously.
Is this a good practice ? I have adequate no. of batch processes.Or I should load DSO -> Cube1 and then DSO -> Cube2 in sequence.
will total run time (Cube 1 + Cube 2) be optimized in parallel load or sequential load.
Not sure will if load of Cube1 will lock the table & increase the overall time for Cube 2 or not. Please help.
Harshawardhan.