Dear SDN,
Really need your help since I'll start setup tomorrow morning and initialization due to sales' need.
I've initialized before but requirement for my company now is to load 2LIS_11_* data without downtime.
I have read in the blog below that possible to do so if you have first level DSO, but our system doesn't.
Zero downtime during setup and initialization LO cockpit
Possible to perform the following steps but i need guidance on how to do selective deletion at the end to ensure there's no duplicate data.
Can you please advise? Kindly check as well if any of the steps below should be corrected/updated.
1. Delete setup tables via /lbwg.
2. Delete delta data in the R3 system via LBWQ or run the delta twice on BW.
3. Delete existing initalization for this datasource.
Understanding is delta jobs would immediately stop once we delete existing initalization.
4. Load setup tables via OLI7BW. I foresee this will take half day given our data.
(should this be before step 2 or after step 5?)
5. Once setup table is completed, run initialization without data. This opens up the delta ques.
Would i still need to schedule the Delta load in LBWE?
6. Once completed, run in BW a full upload with repair flag.
7. Run a delta upload once completed.
8. Since we'll do initialization while system is up, it's possible data will be part of initialized data and delta data.
To prevent duplicates, can you please help advise how to do the selective deletion?
Thanks!