Hi BW Experts
I am having some trouble making changes to an Infopackage in the production environment.System is asking me to create a transport to change the path to a file. Please find what I have tried already below
- I have gone into Transport Connection > Object Changeability and then selected everything changeable for ISIP, DTP and ISIG -this still did not work
- I have changed the system settings to allow changes in SCC4 and SE06 (Everything Modifiable in both) - still not working
The infopackage is for a manual load of flat file and is not in a process chain. The infopackage was transported at the beginning of last year, but they have been able to modify this in the past. (I have verified this through RSSELDONE)
I have suggested to make a copy of the infopackage and make changes but client does not want to do that.
We are currently on BI 7.01 SPS 07, your help would be appreciated
Thanks
Dharmjit