Hi Friends,
I'm working the existiung flow. Basically I want to move a process chain from Dev to quality. I have moved the process chain with all the objects like Application component, Infoarea, DTP, IP TR..etc in the transport request. The objects like DTP, IP APP com, Infoarea .. are already there in quality but I thought it would overwrite the existing flow in qulity so I moved everything. The starnge thing here is it did overwrite everything except IP, I got a new infopackages in quality. So there are 65 new IP's are added up for all the datasurces in quality. The new IP added in quality is from dev, the tecnical name matches here.
Before Importing the request the scenario is like
The below Iinfopackage in DEV
Infpackage ZPAK_DEPL78DUGVDX0X6DDN2RLX72V is only in dev.
The below Iinfopackages in Quality and Production.
Infopackage ZPAK_DEPL7MP6LDTRULSALYPY2NR4N
After Importing the transport request the scenario is like
The below Iinfopackage in DEV
Infpackage ZPAK_DEPL78DUGVDX0X6DDN2RLX72V
The below Iinfopackage in quality
Infpackage ZPAK_DEPL78DUGVDX0X6DDN2RLX72V
Infopackage ZPAK_DEPL7MP6LDTRULSALYPY2NR4N
The below Iinfopackages in Production.
Infopackage ZPAK_DEPL7MP6LDTRULSALYPY2NR4N
My question is why the infopackes are different in dev and production ( Quality and production IP's are in synch before import) and why new IP added in quality after import, the new IP is which is existing in Dev.
Shall i remove the new IP (ZPAK_DEPL7MP6LDTRULSALYPY2NR4N) from quality to keep quality and production in synch.
Does the technical name of IP changes if we move dev to quality and prod.
I appreciate your help.