Hi Gurus,
I have 4 full infopackages in my DSO that will load to PSA and a DTP that will load the extractd data from th 4 infopackages. This is a monthly basis report and the reason that I am planning to have a delete overlapping is we will load the extractor daily on a full load due to backposting from ECC side, so based on the month inserted on the filter in infopackages and dtp, everyday it will generate a new extraction so i need to delete the yesterdays load to update the values.
Is there a way I could have delete overlapping in the process chain in SAP BW for DSO?
Your inputs are very much appreciated.